<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>City of Santa Rosa - Meeting of Board of Public Utilities on 5/5/2022 at 1:30 PM</title><link>https://santa-rosa.legistar.com/Gateway.aspx?M=CalendarDetail&amp;From=RSS&amp;ID=903420&amp;GUID=5B8BDEFE-7CD4-43B3-9344-93E4ABCD0043</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://santa-rosa.legistar.com/Feed.ashx?GUID=5B8BDEFE-7CD4-43B3-9344-93E4ABCD0043&amp;ID=903420&amp;M=CalendarDetail&amp;Title=City+of+Santa+Rosa+-+Meeting+of+Board+of+Public+Utilities+on+5%2F5%2F2022+at+1%3A30+PM" rel="self" type="application/atom+xml" /><item><title>22-206BPU</title><link>https://santa-rosa.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=5569614&amp;GUID=53517D70-089C-45DE-9D14-3AD6006A7F15</link><guid isPermaLink="false">53517D70-089C-45DE-9D14-3AD6006A7F15-2025-05-03-00-42-51</guid><description>File #: 22-206BPU&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: 4.1&lt;br /&gt;Type: BPU- Minutes&lt;br /&gt;Title: April 21, 2022 - Regular Meeting Minutes.&lt;br /&gt;Action: approve as submitted&lt;br /&gt;Result: </description><category>BPU- Minutes</category><pubDate>Sat, 03 May 2025 00:42:51 GMT</pubDate></item><item><title>22-517BPU</title><link>https://santa-rosa.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=5571039&amp;GUID=742CEFAA-DF61-4BD0-B001-FB5530F3DBA4</link><guid isPermaLink="false">742CEFAA-DF61-4BD0-B001-FB5530F3DBA4-2025-05-03-00-42-51</guid><description>File #: 22-517BPU&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: 5.1&lt;br /&gt;Type: BPU- Agenda Item&lt;br /&gt;Title: WATER SUPPLY UPDATE

Staff will update the Board on water supply issues. The Board may discuss this item and give direction to staff.&lt;br /&gt;Action: presented&lt;br /&gt;Result: </description><category>BPU- Agenda Item</category><pubDate>Sat, 03 May 2025 00:42:51 GMT</pubDate></item><item><title>22-112BPU</title><link>https://santa-rosa.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=5571038&amp;GUID=194D62FE-B95C-42BE-AD7E-51F510C96AEB</link><guid isPermaLink="false">194D62FE-B95C-42BE-AD7E-51F510C96AEB-2025-05-03-00-42-50</guid><description>File #: 22-112BPU&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: 6.1&lt;br /&gt;Type: BPU- Consent&lt;br /&gt;Title: MOTION - PROJECT WORK ORDER APPROVAL - ENGINEERING CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES UNDER MASTER PROFESSIONAL SERVICES AGREEMENT WITH GREEN VALLEY CONSULTING ENGINEERS FOR TERRA LINDA AND BUENA VISTA SEWER AND WATER REPLACEMENT - PHASE 1

RECOMMENDATION: It is recommended by the Transportation and Public Works and Water Departments that the Board of Public Utilities, by motion, approve the Project Work Order (PWO) No. A010146-2016-22 with Green Valley Consulting Engineers for Construction Management and Inspection services for Terra Linda and Buena Vista Drive Sewer and Water Replacement Project, for a total amount of $652,533.00 which includes a 15% contingency.&lt;br /&gt;Action: to approve&lt;br /&gt;Result: Pass</description><category>BPU- Consent</category><pubDate>Sat, 03 May 2025 00:42:50 GMT</pubDate></item><item><title>22-113BPU</title><link>https://santa-rosa.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=5570521&amp;GUID=7E3544FE-9EB6-44DA-AE6F-A8A3F1E5CF19</link><guid isPermaLink="false">7E3544FE-9EB6-44DA-AE6F-A8A3F1E5CF19-2025-05-03-00-42-51</guid><description>File #: 22-113BPU&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: 6.2&lt;br /&gt;Type: BPU- Consent&lt;br /&gt;Title: MOTION - CONTRACT AWARD - CONTROLLER AND RADIO UPGRADES AT WATER PUMP STATIONS AND SEWER LIFT STATIONS, CONTRACT NO. C02052

RECOMMENDATION: It is recommended by the Transportation and Public Works Department and the Water Department that the Board of Public Utilities, by motion, approve the project and award Construction Contract No. C02052 in the amount of $1,650,000 to the lowest responsive bidder, Tesco Controls, LLC, of Sacramento, CA for Controller and Radio Upgrades at Water Pump Stations and Sewer Lift Stations Project, approve a 15% contingency and authorize a total contract amount of $1,897,500.&lt;br /&gt;Action: to approve&lt;br /&gt;Result: Pass</description><category>BPU- Consent</category><pubDate>Sat, 03 May 2025 00:42:51 GMT</pubDate></item><item><title>22-312BPU</title><link>https://santa-rosa.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=5570520&amp;GUID=0454919D-3874-4EF3-9347-A9769D54C036</link><guid isPermaLink="false">0454919D-3874-4EF3-9347-A9769D54C036-2025-05-03-00-42-51</guid><description>File #: 22-312BPU&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: 7.1&lt;br /&gt;Type: BPU- Report&lt;br /&gt;Title: REPORT - CONTRACT AWARD - LAGUNA TREATMENT PLANT DISINFECTION IMPROVEMENTS PROJECT

BACKGROUND: Ultraviolet (UV) light is the primary disinfection process for the Laguna Treatment Plant (LTP). In 2012, the State Water Resources Control Board Division of Drinking Water (DDW) re-evaluated and subsequently de-rated the disinfection system capacity from 67 million gallons per day (MGD) to 48.5 MGD, creating a disinfection deficiency under some wet weather conditions. The UV system has been operating over 20 years and is beyond its useful service life.  Plant staff must provide greater resources to address disinfection system limitations such as periodic UV under-dose, coliform exceedance, and cleaning frequency issues. These conditions triggered the need to evaluate disinfection equipment options to ensure that LTP has adequate disinfection capacity of up to 67 million gallons per day. Through various analyses, the City determined that replacing the existing UV system with a new UV system is the most feasible approach to address the capacity and reliability deficiencies.

RECOMMENDAT&lt;br /&gt;Action: to approve&lt;br /&gt;Result: Pass</description><category>BPU- Report</category><pubDate>Sat, 03 May 2025 00:42:51 GMT</pubDate></item></channel></rss>