Title:
|
REPORT - CONTRACT AWARD - DELTA POND DIFFUSER MAINTENANCE, CONTRACT NO. C02200
BACKGROUND: The Delta Pond Diffuser Maintenance project consists of removing approximately 300 cubic yards of sediment that has settled around the Delta Diffuser, the City’s outfall from Delta Pond. The Delta Diffuser consists of eleven 24-inch duck bill valves submerged in Santa Rosa Creek. Two turbidity containment curtains will be installed around the dredging area. The dredged material will be decanted in a designated soil handling area prior to being hauled off-site to an approved location.
RECOMMENDATION: It is recommended by the Transportation and Public Works and Water Departments that the Board of Public Utilities, by motion, award Construction Contract No. C02200 in the amount of $514,728 to Dixon Marine Services of Inverness, CA for Delta Pond Diffuser Maintenance, approve a 15% contingency, and authorize a total contract amount of $591,937.
|
Indexes:
|
Mitigated Negative Declaration
|