To translate an agenda into the language of your choice:

1. Click on the Accessible Agenda link for the specific meeting date and it will open an .html of the agenda.
2. 
Right click on that page, and a dialogue box pops up.  Scroll to translate agenda to (select language of your choice), and click on that command.

Attention Mac User for Google Chrome Version 61.0.3163.100: In order to view attachments on agendas, hold down the Control key and using your mouse track-pad select the attachment you would like to view. Then select the option to Open Link in New Tab.

File #: 22-320BPU    Version: 1 Name: DB Request - Llano Trunk Rehab Ph 1
Type: BPU- Report Status: Agenda Ready
File created: 8/3/2022 In control: Board of Public Utilities
On agenda: 8/18/2022 Final action:
Title: REPORT - AUTHORITY TO ISSUE DESIGN-BUILD REQUEST FOR PROPOSALS FOR THE LLANO TRUNK REHABILITATION PHASE 1 BACKGROUND: As part of the 2021 Sanitary Sewer Master Plan Update, engineering consulting firm Woodard and Curran inspected and assessed approximately 13 miles of large diameter trunk sewers that are part of the City’s collection system to establish rehabilitation and replacement priorities. Nearing the end of its useful life and exhibiting a high risk of failure, sections of the Llano trunk were identified as the highest priority with a recommendation for rehabilitation within one to two years. Utilization of a Design-Build (DB) delivery method could provide the City with the best-qualified DB entity and expedite project delivery through increased collaboration between the engineer, contractor, and City during the design and permitting phases. RECOMMENDATION: It is recommended by the Transportation and Public Works Department and the Water Department that the Board of Public ...
Sponsors: Water, Board of Public Utilities
Indexes: Exempt Project
Code sections: 15302(c) - Replacement or Reconstruction
Attachments: 1. Staff Report, 2. Attachment 1 - Location Map, 3. Presentation (Uploaded 8-17-2022)