21-389ZA
| 1 | 3.1 | Royal Manor HDP | ZA- Agenda Item | HILLSIDE DEVELOPMENT PERMIT - 3855 ROYAL MANOR PL
BACKGROUND: Minor Hillside Development Permit to add approximately 2,916 square feet to the fire rebuild of a 3,994 square foot single-family residence (including garage) destroyed by the Tubbs Fire in 2017, and the construction of a swimming pool. The total area of the new residence is 6,910 square feet (4,710 square feet living space, 737 square feet garage, and 1,463 square feet covered loggias and decks), 2 story, 4 bedroom, 4.5 bath, and attached 3 car garage. File No. HDP21-006
Project Planner: Monet Sheikhali | | |
Not available
|
Not available
|
21-390ZA
| 1 | 3.2 | B Street Fence | ZA- Agenda Item | LANDMARK ALTERATION - 547 & 549 B STREET
BACKGROUND: Installation of a new 6-foot black metal vertical rail security fence with one lower and two upper horizontal rails and gates along portions of the site perimeter. The application has been filed by Roman Catholic Bishop of Santa Rosa. File No. LMA21-017
Project Planner: Adam Ross | | |
Not available
|
Not available
|
21-391ZA
| 1 | 3.3 | College Fence | ZA- Agenda Item | LANDMARK ALTERATION AND DESIGN REVIEW - 439 COLLEGE AVE
THIS ITEM HAS BEEN CONTINUED TO A DATE UNCERTAIN - IT WILL NOT BE CONSIDERED AT THIS MEETING
BACKGROUND: Install new fence with gates and panic hardware to enclose covered concrete entrance. The project qualifies for an exemption under California Environmental Quality Act (CEQA) Guidelines Section 15303. The application has been filed by Zack Parker. File No. PRJ21-018
Project Planner: Adam Ross | | |
Not available
|
Not available
|