1. CALL TO ORDER AND ROLL CALL
2. REMOTE PARTICIPATION UNDER AB 2449 (IF NEEDED)
To consider and take action on any request from a Board Member to
participate in a meeting remotely due to Just Cause or Emergency
Circumstances pursuant to AB 2449 (Government Code Section 54953(f)).
3. BOARD BUSINESS
3.1 STATEMENT OF PURPOSE
The Design Review Board is charged with considering the location,
design, site plan configuration, and the overall effect of proposed projects
upon surrounding properties and the City in general. The Board shall
compare proposed projects to the General Plan, any applicable specific
plan, applicable Zoning Code standards and requirements, consistency of
the project within the City’s Design Guidelines, architectural criteria for
special areas, and other applicable City requirements (e.g., City policy
statements and development plans).
4. STATEMENTS OF ABSTENTION
5. SCHEDULED ITEM(S)
5.1
CONCEPT DESIGN REVIEW - SANTA ROSA EVENTS AND
CONFERENCE CENTER - DESIGN REVIEW - 620 3RD ST -
DR24-027
BACKGROUND: Concept Design Review for a new four-story,
100-foot-tall events and conference center and redesign of Comstock
Mall's hardscape and landscape. The proposed structure will be about
104,000 sq.ft, and there will be a cantilever over Comstock Mall. The
roof of the grand ballroom, located on the top floor, will use space
framing to shape a barrel vault, and uncured copper will be used as its
roofing material.
RECOMMENDATION: Provide comments and recommendations.
PRESENTED BY: Monet Sheikhali, Senior Planner