REPORT - CONTRACT AWARD - DELTA POND DIFFUSER MAINTENANCE, CONTRACT NO. C02200
BACKGROUND: The Delta Pond Diffuser Maintenance project consists of removing approximately 300 cubic yards of sediment that has settled around the Delta Diffuser, the City’s outfall from Delta Pond. The Delta Diffuser consists of eleven 24-inch duck bill valves submerged in Santa Rosa Creek. Two turbidity containment curtains will be installed around the dredging area. The dredged material will be decanted in a designated soil handling area prior to being hauled off-site to an approved location.
RECOMMENDATION: This agenda item will be brought forth in accordance with Resolution No. 900 for expedited construction contract awards. The recommendation to award construction contract Delta Pond Diffuser Maintenance, Contract No. C02200 will be provided as a Report Item presented on June 16, 2022. Due to the current potential risk exposure to the Santa Rosa Regional Water Reuse System and in order to complete ...
|
|