To translate an agenda into the language of your choice:

1. Click on the Accessible Agenda link for the specific meeting date and it will open an .html of the agenda.
2. 
Right click on that page, and a dialogue box pops up.  Scroll to translate agenda to (select language of your choice), and click on that command.

Attention Mac User for Google Chrome Version 61.0.3163.100: In order to view attachments on agendas, hold down the Control key and using your mouse track-pad select the attachment you would like to view. Then select the option to Open Link in New Tab.

File #: 19-306BPU    Version: 1 Name: Water System Reliability Study
Type: BPU- Report Status: Agenda Ready
File created: 3/13/2019 In control: Board of Public Utilities
On agenda: 3/21/2019 Final action:
Title: REPORT - PROFESSIONAL SERVICES AGREEMENT APPROVAL - PROFESSIONAL ENGINEERING SERVICES WITH BLACK AND VEATCH FOR THE 2019 WATER SYSTEM RELIABILITY STUDY BACKGROUND: In 2018, following the Tubbs Fire, the City hired Black & Veatch (B&V) to investigate and analyze the operation and response of the City’s water distribution system in the Fountaingrove Area during the fire. As part of the effort, B&V provided a number of recommendations, including further investigation, to improve the reliability and resilience of the City’s water system as it relates to fire protection as outlined in the “Evaluation of the Water System’s Response in Fountaingrove to the October 2017 Fire” (2018 B&V Report). A Request for Proposal (RFP) soliciting professional engineering services to further investigate the recommendations was advertised on October 30, 2018 and subsequently B&V was selected as the most qualified consultant. The 2019 Water System Reliability Study will support the additi...
Sponsors: Board of Public Utilities
Indexes: Not a Project
Attachments: 1. Staff Report, 2. Attachment 1, 3. Presentation (added 3/21/19)