File #: 19-316BPU    Version: 1 Name: Contract Award - Rehabilitate Matanzas Siphons
Type: BPU- Report Status: Agenda Ready
File created: 7/9/2019 In control: Board of Public Utilities
On agenda: 7/18/2019 Final action:
Title: REPORT - CONTRACT AWARD-REHABILITATE MATANZAS SIPHONS BACKGROUND: This project will rehabilitate the aging wastewater trunk siphon that crosses under Matanzas Creek. The siphon, which was constructed in 1953, consists of four parallel pipes: an 8” asbestos concrete (AC) pipe and three larger concrete pipes (a 12” pipe, an 18” pipe, and a 24” pipe). The project will utilize trenchless cured in place-pipe (CIPP) lining technology on the three larger pipes and the 8” AC pipe, which was originally constructed to convey low flows but is not needed, will be abandoned in place. The inlet and outlet structures will also be assessed during construction and repaired as directed by the engineer. RECOMMENDATION: It is recommended by the Transportation and Public Works Department and the Water Department that the Board of Public Utilities, by motion, approve the project and award Construction Contract No. C02190 in the amount of $3,449,500.00 to the lowest responsive bidder, SAK Construction, LLC...
Sponsors: Board of Public Utilities
Indexes: Exempt Project
Attachments: 1. Staff Report, 2. Attachment 1, 3. Attachment 2, 4. Presentation (added 7/18/19)