Title:
|
PUBLIC HEARING - SANTA ROSA FARM GROUP CANNABIS CULTIVATION FACILITY - DESIGN REVIEW MAJOR - 800 YOLANDA AVE - FILE NO. DR17-078
BACKGROUND: Proposal to develop a commercial Cannabis facility on a ± 5.5-acre site. Proposed development includes demolition of existing structures and construction of a 3-story, ± 116,700 square-foot (sf) industrial building. Onsite improvements include hardscape for vehicle and pedestrian uses, and landscaping, including tree plantings as mitigation for removal of existing trees. Cannabis Cultivation (86,050 sf), Manufacturing Level 1 (non-volatile) and Level 2 (volatile) (21,505 sf), and Distribution (Type 11) (8,070 sf), with Testing laboratory (1,085 sf) land uses approved by Planning Commission Resolution No. 12052 on April 8, 2021.
Presenter: Andrew Trippel, Senior Planner
|
Indexes:
|
Mitigated Negative Declaration Previously Adopted
|