Title:
|
PUBLIC MEETING - AT&T CELL TOWER MODIFICATION, CEQA EXEMPT PROJECT - DESIGN REVIEW - 1594 HAMPTON WAY - DR22-039
BACKGROUND: At antenna level - Remove (6) (e) panel antennas, remove (1) (e) 6' FRP panel form (e) monopole, Install (12) new panel antennas, install (3) new RRUS 4449 B5/B12A, Install (3) new RRUS 4426 B66, Install (1) new collar mount at new 45'-6" rad center, install (1) new dual pole mount at new 62' rad center, Install (2) new DC-9 surge suppressor, remove (1) (e) RBS 3106 cabinet, remove (3) (e) RRUS-11 B12, swap (3) (e) strings of 150AH batteries with (3) new strings of 180 AH batteries inside (e) RBA 72 cabinet, install (8) new rectifiers inside (e) power plant, install (1) new DC12 on rack near existing DC-12, install (3) new RRUS 2012 B29 on (e) H-frame, install (1) new baseband 6630 in (n) purcell cabinet, install (1) new baseband 6648 in new purcell cabinet, install caution signs as required.
Project Planner: Sheila Wolski
|