Skip to main content
 
To translate an agenda into the language of your choice:

1. Click on the Accessible Agenda link for the specific meeting date and it will open an .html of the agenda.
2. 
Right click on that page, and a dialogue box pops up.  Scroll to translate agenda to (select language of your choice), and click on that command

Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.
Meeting Name: Design Review Board (inactive) Agenda status: Final
Meeting date/time: 2/1/2018 2:30 PM Minutes status: Draft  
Meeting location: City Hall, 100 Santa Rosa Ave, Room 7 Santa Rosa, CA 95404
Room 7
Published agenda: Agenda Agenda Published minutes: Not available Meeting Extra3: Not available  
Agenda packet: Not available
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
18-090DRB 1  DRB- Agenda ItemJanuary 18, 2018   Not available Not available
17-073DRB 1  DRB- Agenda ItemZoning Code Chapt.20-52.030 F. Project review. The review authority shall consider the location, design, site plan configuration, and the overall effect of the proposed project upon surrounding properties and the City in general. Review shall be conducted by comparing the proposed project to the General Plan, any applicable specific plan, applicable Zoning Code standards and requirements, consistency of the project within the City’s Design Guidelines, architectural criteria for special areas, and other applicable City requirements (e.g., City policy statements and development plans.)   Not available Not available
18-089DRB 16.1 DRB- Agenda ItemZONING CODE TEXT AMENDMENT REPORT - CITYWIDE - FILE NO. REZ17-013 BACKGROUND: The proposed Text Amendment would add Chapter 20-16, Resilient City Development Measures, to the Zoning Code to address housing needs and economic development within the City following the Tubbs and Nuns fires of October 2017. The Design Review Board will consider the proposed changes to the Design Review process. The amendment will be reviewed in its entirety by the Planning Commission on February 8, 2018. Planner: Jones   Not available Not available