22-010PC
| 1 | | March 10, 2023 - Draft Minutes | PC- Minutes | March 10, 2022 - Draft Minutes | | |
Action details
|
Video
|
22-009PC
| 1 | | March 24, 2022 - Draft Minutes | PC- Minutes | March 24, 2022 - Draft Minutes | | |
Action details
|
Video
|
22-008PC
| 1 | | May 26, 2022 - Draft Minutes | PC- Minutes | May 26, 2022 - Draft Minutes | | |
Action details
|
Video
|
22-007PC
| 1 | | June 9, 2022 Draft Minutes | PC- Minutes | June 9, 2022 - Draft Minutes | | |
Action details
|
Video
|
22-430PC
| 1 | 8.1 | California Organica | PC- Agenda Item | PUBLIC HEARING - CALIFORNIA ORGANICA INC.- CONDITIONAL USE PERMIT - 1825 FERDINAND CT - CUP21-091
BACKGROUND: California Organica Inc. is a proposed project that requires Major Conditional Use permit approval and includes the operation of an existing industrial building as a cannabis facility with onsite cannabis uses including Cannabis Manufacturing Level 1 (non-volatile) (2,788 SF), Distribution (3,481 SF), and Cultivation - 5,001 sq ft or greater (8,033 SF). An additional 1,572 SF of administrative office space would support the operation of the Cannabis - Distribution land use.
PROJECT PLANNER: Conor McKay | to waive reading of the text and adopt | Pass |
Action details
|
Video
|