Skip to main content
 
To translate an agenda into the language of your choice:

1. Click on the Accessible Agenda link for the specific meeting date and it will open an .html of the agenda.
2. 
Right click on that page, and a dialogue box pops up.  Scroll to translate agenda to (select language of your choice), and click on that command

Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.
Meeting Name: Contract Review Subcommittee Agenda status: Final
Meeting date/time: 4/2/2024 3:00 PM Minutes status: Draft  
Meeting location: Utility Field Offices 35 Stony Point Rd. - Training Room M
Published agenda: Agenda Agenda Accessible Agenda Accessible Agenda Published minutes: Not available Meeting Extra3: Not available  
Agenda packet: Not available
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
24-005CR 13.1PSA LTP Delta Pond Generator and Boiler ReplacementsCR- Agenda ItemPROPOSED PROFESSIONAL SERVICES AGREEMENT WITH INTEGRATED PROJECT SOLUTIONS FOR ENGINEERING DESIGN SERVICES FOR THE DELTA POND STANDBY GENERATOR AND LAGUNA TREATMENT PLANT ANNEX BOILER REPLACEMENTS PROJECT The proposed professional services agreement provides engineering design services for the Delta Pond Standby Generator and Laguna Treatment Plant (LTP) Annex Boiler Replacements project. This project will rehabilitate critical infrastructure ancillary to the Santa Rosa Regional Water Reuse System at two separate locations. The Capital Projects Engineering Team proposes entering into a Professional Services Agreement with Integrated Project Solutions of Walnut Creek, California, for engineering design and permitting services as required for the project with a not to exceed amount of $392,282.00.   Not available Not available