24-005CR
| 1 | 3.1 | PSA LTP Delta Pond Generator and Boiler Replacements | CR- Agenda Item | PROPOSED PROFESSIONAL SERVICES AGREEMENT WITH INTEGRATED PROJECT SOLUTIONS FOR ENGINEERING DESIGN SERVICES FOR THE DELTA POND STANDBY GENERATOR AND LAGUNA TREATMENT PLANT ANNEX BOILER REPLACEMENTS PROJECT
The proposed professional services agreement provides engineering design services for the Delta Pond Standby Generator and Laguna Treatment Plant (LTP) Annex Boiler Replacements project. This project will rehabilitate critical infrastructure ancillary to the Santa Rosa Regional Water Reuse System at two separate locations. The Capital Projects Engineering Team proposes entering into a Professional Services Agreement with Integrated Project Solutions of Walnut Creek, California, for engineering design and permitting services as required for the project with a not to exceed amount of $392,282.00. | | |