To translate an agenda into the language of your choice:

1. Click on the Accessible Agenda link for the specific meeting date and it will open an .html of the agenda.
2. 
Right click on that page, and a dialogue box pops up.  Scroll to translate agenda to (select language of your choice), and click on that command.

Attention Mac User for Google Chrome Version 61.0.3163.100: In order to view attachments on agendas, hold down the Control key and using your mouse track-pad select the attachment you would like to view. Then select the option to Open Link in New Tab.

Meeting Name: Board of Public Utilities Agenda status: Draft
Meeting date/time: 5/23/2019 1:30 PM Minutes status: Final  
Meeting location: Utilities Field Office 35 Stony Point Rd.
Special Meeting
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Accessible Minutes Accessible Minutes  
Agenda packet: Not available
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
19-115BPU 14.1Authorization for Interim Director to Serve on ACWA Region 1 Board of DirectorsBPU- ConsentRESOLUTION - AUTHORIZATION FOR THE INTERIM WATER DIRECTOR TO SERVE AS A MEMBER OF THE ASSOCIATION OF CALIFORNIA WATER AGENCIES (ACWA) REGION 1 BOARD OF DIRECTORS RECOMMENDATION: It is recommended by the Water Department that the Board of Public Utilities, by resolution, nominate Jennifer Burke as a member of the Association of California Water Agencies (ACWA) Region 1 Board for the 2020-21 term.approvedPass Action details Not available
19-312BPU 15.1Contract Award - Llano Trunk Lining West CollegeBPU- ReportREPORT - CONTRACT AWARD - LLANO TRUNK LINING - W COLLEGE UTILITIES FACILITY BACKGROUND: This Contract will provide for the rehabilitation of approximately 60 linear feet of 36-inch reinforced concrete pipe (RCP) trunk sewer main and approximately 1,000 linear feet of 48-inch RCP trunk sewer main by means of trenchless cured-in-place pipe (CIPP) lining technology. This project will also involve the rehabilitation of 6 existing sewer manholes via a corrosion resistant epoxy liner. Approximately 10.5 million gallons per day of sewage bypass pumping will be required to construct these improvements. RECOMMENDATION: It is recommended by the Transportation and Public Works Department and the Water Department that the Board of Public Utilities, by motion, approve the project and award Construction Contract No. C02042 in the amount of $2,275,963.00 to the lowest responsive bidder, SAK Construction, LLC, of O’Fallon, Missouri, for Llano Trunk Lining - W College Utilities Facility, approve a 10% contingency, and authorize a total contract amount of $2,503,559.30.approvedPass Action details Not available
19-116BPU 15.2Waiver of Competitive Process and Sole Source Award - Aqua Screen Parts and Specialty LaborBPU- ConsentREPORT - WAIVER OF COMPETITIVE PROCESS AND SOLE SOURCE AWARD FOR BLANKET PURCHASE OF AQUA SCREEN PARTS AND SPECIALTY LABOR BACKGROUND: The City of Santa Rosa owns and operates a headworks that is critically responsible for providing preliminary treatment to incoming raw sewage from the regional collection system at the Laguna Wastewater Treatment Plant. The headworks process is principally comprised of four Andritz Aqua-screen finescreens. On May 1, 2019 and May 14, 2019, respectively, the southeast and northwest screens each experienced a catastrophic failure leaving them unable to function. Until a more complete evaluation of the system can be performed, the City is yet uncertain exactly which parts will be necessary to facilitate the repair. As Andritz’s sole factory representative in Northern California, MISCOwater is proposing to provide the specialty inspection necessary to scope the extent of the needed repairs and furnish the required parts. The specialized parts required for repair of the system have long lead times and need to be purchased expediently so that the City willapprovedPass Action details Not available