To translate an agenda into the language of your choice:

1. Click on the Accessible Agenda link for the specific meeting date and it will open an .html of the agenda.
2. 
Right click on that page, and a dialogue box pops up.  Scroll to translate agenda to (select language of your choice), and click on that command.

Attention Mac User for Google Chrome Version 61.0.3163.100: In order to view attachments on agendas, hold down the Control key and using your mouse track-pad select the attachment you would like to view. Then select the option to Open Link in New Tab.

Meeting Name: Board of Public Utilities Agenda status: Final
Meeting date/time: 6/18/2020 1:30 PM Minutes status: Final  
Meeting location: City Council Chamber 100 Santa Rosa Avenue
Published agenda: Agenda Agenda Published minutes: Minutes Minutes Accessible Minutes Accessible Minutes  
Agenda packet: Not available
Attachments:
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
20-212BPU 14.1April 16, 2020 - Regular Meeting Minutes.BPU- MinutesApril 16, 2020 - Regular Meeting Minutes.approve as submitted  Action details Not available
20-564BPU 15.1Recycled Water Supply UpdateBPU- Agenda ItemRECYCLED WATER SUPPLY UPDATE Staff will update the Board on recycled water supply issues. The Board may discuss this item and give direction to staff.presented  Action details Video Video
20-127BPU 16.1Construction Mgmt and Inspection - Skyfarm 'A' and Hansford Court Lift Station ReconstructionBPU- ConsentMOTION - PROFESSIONAL SERVICES AGREEMENT FOR CONSTRUCTION MANAGEMENT AND INSPECTION - SKYFARM ‘A’ AND HANSFORD COURT LIFT STATION RECONSTRUCTION RECOMMENDATION: It is recommended by the Transportation and Public Works Department, the Water Department and the Contract Review Subcommittee that the Board, by motion, approve a Professional Services Agreement with Coastland Civil Engineering, of Santa Rosa, CA, for construction management and inspection services associated with construction contract C02201 - Skyfarm ‘A’ and Hansford Court Lift Station Reconstruction in the amount not to exceed $328,108.00.approvedPass Action details Video Video
20-128BPU 16.2Construction Mgmt and Inspection - Llano Trunk - West Third St., Brittain to Darla and Glenbrook Siphon LiningBPU- ConsentMOTION - PROFESSIONAL SERVICES AGREEMENT FOR CONSTRUCTION MANAGEMENT AND INSPECTION - LLANO TRUNK - WEST THIRD ST., BRITTAIN TO DARLA AND GLENBROOK SIPHON LINING RECOMMENDATION: It is recommended by the Transportation and Public Works Department, the Water Department, and the Contract Review Subcommittee that the Board, by motion, approve the Professional Services Agreement with PSOMAS, of Walnut Creek, CA for construction management and inspection services associated with the construction contract C02285 - Llano Trunk - West Third St., Brittain to Darla and Glenbrook Siphon Lining in the amount not to exceed $418,594.00.approvedPass Action details Video Video
20-313BPU 17.1Contract Award - PSA with Jacobs Engineering Group, Inc. for Emergency Generator Engine Radiators and Fuel Tank Replacement and LTP Fleet Gasoline Fueling Station Alternatives Evaluation and Engineering Design SvcsBPU- ReportREPORT - CONTRACT AWARD - PROFESSIONAL SERVICES AGREEMENT WITH JACOBS ENGINEERING GROUP INC. FOR EMERGENCY GENERATOR ENGINE RADIATORS AND FUEL TANK REPLACEMENT AND LTP FLEET GASOLINE FUELING STATION ALTERNATIVES EVALUATION AND ENGINEERING DESIGN SERVICES BACKGROUND: The City owns and operates two standby emergency generators to provide power to the Laguna Treatment Plant (LTP) in the event of a power outage. The radiators on the engines that drive the generators have leaks, they are at the end of their useful life, and need to be replaced. The emergency generators at LTP are powered by diesel fuel from an underground storage tank, the tank is at the end of its useful life and needs to be replaced. Lastly, there is currently only a diesel fueling station at LTP. The addition of an on-site gasoline fueling station would provide operational resiliency, particularly during emergencies such as Public Safety Power Shutdowns. This proposed action will allow for the evaluation of alternatives for each of the project components including: the replacement of the emergency generator engine rapprovedPass Action details Video Video
20-312BPU 17.2PSA Approval for Design Services for Backup Generators at WAter and Wastewater FacilitiesBPU- ReportREPORT - PROFESSIONAL SERVICES AGREEMENT APPROVAL FOR DESIGN SERVICES FOR BACKUP GENERATORS AT WATER AND WASTEWATER FACILITIES BACKGROUND: This project would replace emergency generators and related equipment at eighteen critical water and wastewater facilities. These are dual-fuel generators determined to be problematic following the 2017 wildfire and diesel generators that have exceeded their service life. The City has received Hazard Mitigation Program funds from FEMA to reimburse 75% of design, construction management, and construction costs for these replacements. RECOMMENDATION: It is recommended by the Transportation and Public Works Department, the Water Department, and the Contract Review Subcommittee that the Board, by motion, approve the Professional Services Agreement (PSA) with Brelje & Race Consulting Engineers, of Santa Rosa, CA, for design services for Backup Generators at Water and Wastewater Facilities in the amount not to exceed $485,500.00.approvedPass Action details Video Video